School renovation for 1,700 children in Nigeria

by HUMAN-Stiftung
Play Video
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria
School renovation for 1,700 children in Nigeria

Project Report | Aug 20, 2021
Renovation U-Block Amuro/Mgbom-School

By Karlheinz Neumann | Founder and Project Leader

Parts of the U-Block needs to be dismantled
Parts of the U-Block needs to be dismantled

After completing all construction activities on the well and the water supply on the school area for the students, teachers and the kitchen, we concentrated on the planning and financing of the renovation of the first dilapidated school building (the so called U-Block) with approx. 4,000 square feet of floor space.

The condition of the building is very bad, and a lot of construction work is required. The implementation of the measures began on July 10, 2021, and will proceed as follows:

  • Purchase of the essential materials for the first phase: sand, stones, cement, iron rods, wood for the construction of the doors and windows.
  • Selection of the construction company and workers and start of construction.
  • Dismantling of the roof, digging the foundation, demolishing all dilapidated walls, laying of the new foundation, pouring the columns and pillars, connecting the foundation with suspended concrete beams, as the nature of the soil causes cracks in the walls. Most of the concreting and masonry work will then be done.
  • At the same time, the doors and windows will be built.
  • The second phase mainly consists of the work on the roof and the ceilings. Before plastering, the wiring of the electrical system follows. There is currently no electricity, but preparations are already being made for future use. The last step is tiling the floors, installing doors and windows, painting and completing the electrical installations.

Wind and rain damaged the roof of another building, which was repaired at short notice. In the first phase of the renovation, the roof and the dilapidated walls will be dismantled. A solid foundation is then created so that the walls do not burst again. The foundation is the big problem of all buildings because of the soft soil and the simple old buildings.

The soil texture at the school is very poor for construction work. The soil is not stable. When it rains, the soil increases in volume and expands. During the dry season it contracts and shrinks. The instability of the terrain causes the walls of the buildings in the school to crack.

The site engineer now concretes the pillars first and then creates concrete beams from the ground level that will chain the pillars together. On these concrete beams, the blocks are raised up to the lintel level and then another beam is created at roof level. The structure is supported on the floor beams and are filled with laterite down to the foundation. The hardened laterite is a typical construction material in this area.

The costs for the renovation of the U-block amount to approx. USD 40,000. Completion of the work is planned for the end of 2021.

Renovation work of the U-Block started
Renovation work of the U-Block started
Dismantling of the roof and walls
Dismantling of the roof and walls
Construction plan U-Block
Construction plan U-Block
Foundation work of the U-Block
Foundation work of the U-Block
Work on setting pillars
Work on setting pillars
Work on setting pillars
Work on setting pillars
Concrete reinforcement
Concrete reinforcement
Share on Twitter Share on Facebook

About Project Reports

Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.

If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.

Sign up for updates

Organization Information

HUMAN-Stiftung

Location: Neuss - Germany
Website:
Facebook: Facebook Page
Project Leader:
first2197429 last2197429
United States
$22,396 raised of $40,000 goal
 
370 donations
$17,604 to go
Donate Now

Help raise money!

Support this important cause by creating a personalized fundraising page.

Start a Fundraiser

Learn more about GlobalGiving

Teenage Science Students
Vetting +
Due Diligence

Snorkeler
Our
Impact

Woman Holding a Gift Card
Give
Gift Cards

Young Girl with a Bicycle
GlobalGiving
Guarantee

Get incredible stories, promotions, and matching offers in your inbox

WARNING: Javascript is currently disabled or is not available in your browser. GlobalGiving makes extensive use of Javascript and will not function properly with Javascript disabled. Please enable Javascript and refresh this page.